Bulelwa Makomane Surface Roads and Stormwater
The upgrade and completion of Bulelwa Makomane Street to surfaced standard inclusive of stormwater in Mayibuye, commenced in September 2023 and completed in June 2024. Infraconsult Engineering was appointed to render Professional Engineering Services with respect to planning, feasibility study, designing and construction supervision which includes 0.3km length of Bulelwa Makomanes’ road and stormwater pipeline system.
...
The upgrade and completion of Bulelwa Makomane Street to surfaced standard inclusive of stormwater in Mayibuye, commenced in September 2023 and completed in June 2024. Infraconsult Engineering was appointed to render Professional Engineering Services with respect to planning, feasibility study, designing and construction supervision which includes 0.3km length of Bulelwa Makomanes’ road and stormwater pipeline system.
The upgrade and completion of Bulelwa Makomane Street to surfaced standard inclusive of stormwater in Mayibuye, commenced in September 2023 and completed in June 2024. Infraconsult Engineering was appointed to render Professional Engineering Services with respect to planning, feasibility study, designing and construction supervision which includes 0.3km length of Bulelwa Makomanes’ road and stormwater pipeline system.
Mayibuye Surface Roads and Associated Stormwater
The project entaled the upgrade of gravel roads to surface standards inclusive of associated stormwater in Mayibuye and commenced in February 2021 and completed in June 2023. Infraconsult Engineering was appointed to render professional engineering services with respect to construction supervision which includes upgrading a total length of 3.249 km of roads from gravel to surfaced standard with 5.5m wide asphalt surface and constructing a total length of 1.885 km of stormwater pipe system.
...
The project entaled the upgrade of gravel roads to surface standards inclusive of associated stormwater in Mayibuye and commenced in February 2021 and completed in June 2023. Infraconsult Engineering was appointed to render professional engineering services with respect to construction supervision which includes upgrading a total length of 3.249 km of roads from gravel to surfaced standard with 5.5m wide asphalt surface and constructing a total length of 1.885 km of stormwater pipe system.
The Bulk Stormwater and Bulk Sewer Related Infrastructure of Sky City Mega Housing Development is funded by Cosmopolitan Projects Johannesburg (PTY) Ltd.
More specifically, the project entails the construction of:
• Gravity bulk outfall sewer that consisted of a 350mm diameter to 500mm diameter pipeline tying into an existing Germiston 1500mm diameter outfall sewer.
• Cut-off channel that catches surface runoff from a catchment of 640 000m2 that is conveyed through a double-barrel 900mm diameter concrete pipe.
• Rehabilitation dams that will receive surface flow from various inlets and discharge stormwater runoff at different discharge points.
• Rehabilitation of borrow pits to effectively halt and reverse degradation, improve ecosystem services and recover biodiversity.
• Attenuation facilities to be constructed on D3 - Dolomitic designated risk areas.
• The final constructed layer of each attenuation pond has a 150mm soil mix made up of 5% sodium bentonite.
• Depth limitation of attenuation facilities due to ground slopes and dolomitic risk conditions.
• Lower-lying areas that would require pumping of sewer effluent to an existing outfall sewer.
Construction started in August 2021 and was completed in January 2023....
The Bulk Stormwater and Bulk Sewer Related Infrastructure of Sky City Mega Housing Development is funded by Cosmopolitan Projects Johannesburg (PTY) Ltd.
More specifically, the project entails the construction of:
• Gravity bulk outfall sewer that consisted of a 350mm diameter to 500mm diameter pipeline tying into an existing Germiston 1500mm diameter outfall sewer.
• Cut-off channel that catches surface runoff from a catchment of 640 000m2 that is conveyed through a double-barrel 900mm diameter concrete pipe.
• Rehabilitation dams that will receive surface flow from various inlets and discharge stormwater runoff at different discharge points.
• Rehabilitation of borrow pits to effectively halt and reverse degradation, improve ecosystem services and recover biodiversity.
• Attenuation facilities to be constructed on D3 - Dolomitic designated risk areas.
• The final constructed layer of each attenuation pond has a 150mm soil mix made up of 5% sodium bentonite.
• Depth limitation of attenuation facilities due to ground slopes and dolomitic risk conditions.
• Lower-lying areas that would require pumping of sewer effluent to an existing outfall sewer.
Construction started in August 2021 and was completed in January 2023.
New Modder Extension 8
Client: Valumax (PTY) Ltd
The New Modder Project is an integrated housing development within the City of Ekurhuleni Metropolitan Municipality (COE) and was developed by Valumax (Pty) Ltd. The development is located just off of Snake Road Off-ramp (N12) in the suburb of New Modder, Benoni.
Construction commenced in January 2022 and completion was in November 2022. The completed project included 688 single residential units.
The scope of work included the provision of internal engineering services such as water, sanitation, roads and stormwater, a road intersection upgrade and a link sewer had to be constructed....
Client: Valumax (PTY) Ltd
The New Modder Project is an integrated housing development within the City of Ekurhuleni Metropolitan Municipality (COE) and was developed by Valumax (Pty) Ltd. The development is located just off of Snake Road Off-ramp (N12) in the suburb of New Modder, Benoni.
Construction commenced in January 2022 and completion was in November 2022. The completed project included 688 single residential units.
The scope of work included the provision of internal engineering services such as water, sanitation, roads and stormwater, a road intersection upgrade and a link sewer had to be constructed.
Palm Ridge Extension 37
Client: Greenfields Gardens (PTY) Ltd
The Palm Ridge Project is an integrated housing development within the City of Ekurhuleni Metropolitan Municipality (COE). The development is located immediately south-east of the Palm Ridge Residential Development (Extensions 35 and 38) and south of the Heidelberg Road (R550 / Future K154) towards Nigel.
Once completed, the development aims to offer 762 residential units, consisting of single residential units.
The scope of work includes the provision of internal engineering services such as water, sanitation, roads and stormwater and Construction commenced in January 2023 and completed in November 2023....
Client: Greenfields Gardens (PTY) Ltd
The Palm Ridge Project is an integrated housing development within the City of Ekurhuleni Metropolitan Municipality (COE). The development is located immediately south-east of the Palm Ridge Residential Development (Extensions 35 and 38) and south of the Heidelberg Road (R550 / Future K154) towards Nigel.
Once completed, the development aims to offer 762 residential units, consisting of single residential units.
The scope of work includes the provision of internal engineering services such as water, sanitation, roads and stormwater and Construction commenced in January 2023 and completed in November 2023.
Windmill Park Extension 32
Client: KIRON (PTY) Ltd
The Windmill Park Project is an integrated housing development within the City of Ekurhuleni Metropolitan Municipality (COE).
The development is located south of the provincial road K133 (North Boundary Road) and east of the existing Windmill Park Extension 31 and 38.
Infraconsult Engineering was appointed as consulting engineers for this residential development that has the potential of 655 residential units.
The scope of work includes the provision of internal engineering services such as water, sanitation, roads and stormwater and Construction commenced in June 2023 and completion should be by January 2025....
Client: KIRON (PTY) Ltd
The Windmill Park Project is an integrated housing development within the City of Ekurhuleni Metropolitan Municipality (COE).
The development is located south of the provincial road K133 (North Boundary Road) and east of the existing Windmill Park Extension 31 and 38.
Infraconsult Engineering was appointed as consulting engineers for this residential development that has the potential of 655 residential units.
The scope of work includes the provision of internal engineering services such as water, sanitation, roads and stormwater and Construction commenced in June 2023 and completion should be by January 2025.
Dawn Park Extension 52
Client: Kiron (PTY) Ltd
The Dawn Park Project is an integrated housing development within the City of Ekurhuleni Metropolitan Municipality (COE). The development is located south of the provincial road K132 (North Boundary Road) and east of the newly developed Dawn Park Extension 46, 47, 54, 55 and 56.
Construction commenced in March 2023 and completed in February 2024. The development offers 579 residential units, consisting of single residential units.
Infraconsult Engineering was appointed as consulting engineers for this residential development which includes the provision of internal engineering services such as water, sanitation, roads and stormwater and attenuation facilities....
Client: Kiron (PTY) Ltd
The Dawn Park Project is an integrated housing development within the City of Ekurhuleni Metropolitan Municipality (COE). The development is located south of the provincial road K132 (North Boundary Road) and east of the newly developed Dawn Park Extension 46, 47, 54, 55 and 56.
Construction commenced in March 2023 and completed in February 2024. The development offers 579 residential units, consisting of single residential units.
Infraconsult Engineering was appointed as consulting engineers for this residential development which includes the provision of internal engineering services such as water, sanitation, roads and stormwater and attenuation facilities.
Chris Hani Extension 4-7
Client: KIRON (PTY) Ltd
The Chris Hani project is an integrated housing development within the City of Ekurhuleni Metropolitan Municipality (COE). The development is situated with easy access from the N12 Freeway and is located North of the N12 Freeway, South of Daveyton near Etwatwa and Johannesburg.
Construction commenced in March 2022 and completion in March 2024. The development offers 2560 residential units, consisting of single residential units.
Infraconsult Engineering was appointed as consulting engineers for this residential development which includes the provision of internal engineering services such as water, sanitation, roads and stormwater and attenuation facilities....
Client: KIRON (PTY) Ltd
The Chris Hani project is an integrated housing development within the City of Ekurhuleni Metropolitan Municipality (COE). The development is situated with easy access from the N12 Freeway and is located North of the N12 Freeway, South of Daveyton near Etwatwa and Johannesburg.
Construction commenced in March 2022 and completion in March 2024. The development offers 2560 residential units, consisting of single residential units.
Infraconsult Engineering was appointed as consulting engineers for this residential development which includes the provision of internal engineering services such as water, sanitation, roads and stormwater and attenuation facilities.